5D97 2028 Crofton Depot to Doncaster

TrainTimesLive
Menu Close menu

22nd September 2026

20:28 – Crofton Depot → Doncaster Arrived +1 Late operated by Grand Central

Empty coaching stock not available to passengers

Reported as far as Doncaster · 2 of 2 stops made · 25 of 25 miles

Formation Class 180

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
XRF Crofton Depot not advertised 2028 2005 -23
Crofton East Spur not advertised 20312036 2021 -15
Crofton East Junction not advertised 2037½2043 2021 -22
PFM Pontefract Monkhill pass 1 min engineering allowance 2 20512051 pass2036 -14
Knottingley West Junction pass 20552055 pass2042 -13
Knottingley South Junction pass 2056½2056½ pass2043 -13
Haywood Junction pass 21072107 pass2053 -14
Shaftholme Junction not advertised 1 min engineering, 1 min pathing allowance 21102114½ 20532114 ·on time
DON Doncaster not advertised 6 was 1 2122 2123 +1

Italic estimated timing, bold is actual.