The railway on 9th November 2026

TrainTimesLive
Menu Close menu

9th November 2026 still running

33,300Trains22,720 carrying passengers
89.8%On timeof those that arrived
2.3 minAverage delayat their last call
349Cancelledplanned ones included
902Part cancelledran for only part of the journey
489No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 26 38.5% 16 0 0 15.4 min
London North Eastern Railway 188 44.7% 83 26 12 27.3 min
Avanti West Coast 309 73.8% 75 9 14 8.1 min
CrossCountry 270 76.5% 57 12 15 6.8 min
TransPennine Express 298 76.9% 63 0 25 6.3 min
Great Northern 383 80.6% 71 3 14 3.2 min
Elizabeth line 666 81.1% 70 22 274 3 min
Northern 2,635 82% 438 73 128 3.1 min
East Midlands Railway 477 84.5% 73 1 5 3.5 min
Transport for Wales 1,017 87.5% 117 19 59 2.1 min
Southeastern 1,728 88.5% 189 18 61 2.5 min
Great Western Railway 1,648 89.9% 165 12 9 2.1 min
South Western Railway 1,548 90.1% 144 16 77 2 min
Southern 1,630 91.8% 129 21 40 2.2 min
c2c 256 92.3% 19 0 9 2 min
Thameslink 608 92.9% 40 11 35 1.7 min
London Underground 171 94.1% 8 35 0 1.4 min
South Yorkshire Supertram 36 94.4% 2 0 0 0.6 min
West Midlands Trains 1,264 94.9% 63 4 15 0.9 min
ScotRail 2,186 95.2% 102 6 44 1.1 min
Gatwick Express 70 95.5% 3 2 2 3 min
Heathrow Express 150 95.9% 6 2 0 1.3 min
Chiltern Railways 333 96.1% 13 0 0 0.4 min
London Overground 1,478 96.7% 45 45 52 1.1 min
Greater Anglia 1,257 97% 38 3 1 0.4 min
Merseyrail 604 98.6% 8 5 7 on time
Tyne and Wear Metro 88 98.8% 1 2 0 1.2 min

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 5,939 5,939 88.5% 4.3 min
Other (5 min) 14,193 14,184 90.3% 1.5 min

Cancellations

KindTrains Share
Attributed 305 87.4%
Reported by National Rail 20 5.7%
Unexplained 18 5.2%
Planned 6 1.7%

Why most common first

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 20% (247)
Agreed in advance between Network Rail and the operator PL 9.1% (112)
The train due to form it arrived late YI 8.2% (101)
Not investigated by Network Rail OU 8% (99)
Not yet investigated ZW 7.4% (92)
Fatalities or injuries caused by being hit by train XC 5.1% (64)
At the train operator's request TB 4% (50)
AC/DC trip (including no fault or cause found) I2 3.1% (38)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 2.9% (36)
Driver TG 2.5% (31)
Overhead line/3rd rail defect I1 2.3% (28)
Other technical failures (doors, body or interior) M8 2.2% (27)
Points failure (including no fault found) IB 2.2% (27)
Other technical failures below the solebar MD 1.9% (24)
Track circuit failure (including no fault found) IC 1.6% (20)
WTT Schedule or LTP process including incorrect simplifiers QA 1.5% (18)
Senior Conductor or Train Manager TH 1.1% (14)
Possession over-run from planned work I5 1% (12)
Depot operating problem MU 0.9% (11)
Bridge Strike XP 0.9% (11)
Disorder, drunks or trespass VA 0.8% (10)
Animal Strike or Incursion within the control of Network Rail I8 0.7% (9)
Trespass including non-intentional XA 0.6% (8)
Planned underpowered or shortformed service or vehicle MS 0.5% (6)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.4% (5)
Brake and brake system faults including wheel flats MN 0.4% (5)

All trains in the network

StateAll Passenger
Arrived 27,044 20,817
Planned 2,375 64
En route 1,617 883
Cancelled 1,237 555
Activated 538 115
No arrival reported 489 286