This is the 1Z25 1830½ Swindon to Cheltenham Spa on 22nd September 2026. See today's trains from Swindon around 1830 →
22nd September 2026 Simple View
1Z25 · 18:30½ – Swindon → Cheltenham Spa Cancelled — External utility incident including gas, water mains and overhead power lines
VSTPVery short term plan, created on or near the day Pathed as Class 802 on diesel at 125mph
Reported as far as Horton Road Junction · 5 of 6 stops made · 37 of 43 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Formed from 1L84 from Cheltenham Spa arrived 18:02 800014 | |||||||
| Public | Working | Actual | Route | ||||
|---|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | arrdep | Status | Line | Path |
| SWI Swindon | 1 was 3 | 1830 | 1830½ | 1846 | +16 | ||
| Rodbourne Junction pass | pass1832½ | pass1849 | +17 | ||||
| KEM Kemble | 2 | 18421843 | 1841½1843½ | 18591900 | +17 | ||
| St Mary's Level Crossing pass | pass1853½ | pass1908 | +15 | ||||
| STD Stroud | 2 | 18581859 | 1857½1859½ | 1912 | +15 | ||
| SHU Stonehouse | 2 | 19031905 | 19031905 | no reportno report | |||
| Standish Junction pass 1 min engineering allowance | pass1907½ | pass1920 | +13 | ||||
| Gloucester Yard Junction pass 1 min pathing allowance | pass1913½ | pass1927 | +14 | ||||
| Horton Road Junction pass | pass1915½ | passno report | |||||
| GCR Gloucester | 1 was 2 | 19171925 | 1917½1926 | 1930 | +13 | ||
| Horton Road Junction pass MLLine | pass1927 | pass1928 | +13 | ML | |||
| Barnwood Junction pass | pass1928 | pass1941 | |||||
| CNM Cheltenham Spa | 2 | 1934 | 1934 | 1947 | |||
| Forms 1G29 to Worcester Shrub Hill departs 19:36 800014 | |||||||
Italic estimated timing, bold is actual.