This is the 1W39 1344 London Paddington to Great Malvern on 20th September 2026. See today's trains from London Paddington around 1344 →
20th September 2026 Detailed View
13:44 – London Paddington → Great Malvern Partially cancelled — Uninvestigated Cancellations System Roll-Ups only operated by Great Western Railway
This service was cancelled between Didcot Parkway and Great Malvern.
electric for 40 min · diesel from Didcot Parkway for 1h49
Reported as far as Didcot Parkway · 3 of 17 stops made, 14 cancelled · 53 of 129 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| PAD London Paddington | 10 was 5 | 1344 | 1344 | ·on time | ||
| RDG Reading | 8 | 1415 | 1416 | 1417 | 1418 | +1 |
| DID Didcot Parkway | 3 | 1432 | 1434 | 1432 | ·on time | |
| RAD Radley | 1 | 1441 | 1441 | Cancelled | ||
| OXF Oxford | 4 | 1449 | 1451 | Cancelled | ||
| HND Hanborough | 1500 | 1500 | Cancelled | |||
| CBY Charlbury | 1 | 1507 | 1507 | Cancelled | ||
| KGM Kingham | 1515 | 1516 | Cancelled | |||
| MIM Moreton-in-Marsh | 1 | 1523 | 1524 | Cancelled | ||
| HYB Honeybourne | 1 | 1534 | 1535 | Cancelled | ||
| EVE Evesham | 1541 | 1542 | Cancelled | |||
| PSH Pershore | 1548 | 1548 | Cancelled | |||
| WPH Worcestershire Parkway (High Level) | 1553 | 1554 | Cancelled | |||
| WOS Worcester Shrub Hill | 1 | 1602 | 1602 | Cancelled | ||
| WOF Worcester Foregate Street | 1 | 1605 | 1606 | Cancelled | ||
| MVL Malvern Link | 1614 | 1615 | Cancelled | |||
| GMV Great Malvern | 1618 | Cancelled |
Italic estimated timing, bold is actual.