This is the 1B20 0930 London Paddington to Carmarthen on 13th September 2026. See today's trains from London Paddington around 0930 →
13th September 2026 Detailed View
09:30 – London Paddington → Carmarthen Arrived +11 Late operated by Great Western Railway
Planned diversion. Calling at Didcot Parkway, which this service does not normally serve.
This service has been delayed by a late running train being in front of this one.
electric for 1h55 · diesel from Cardiff Central for 1h41
Reported as far as Carmarthen · 14 of 14 stops made · 222 of 222 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
London Paddington → Swansea
1 of 2
Swansea → Carmarthen
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| PAD London Paddington | 2 | 0930 | 0929 | -1 | ||
| RDG Reading | 9 | 0959 | 1000 | 1000 | 1003 | +3 |
| DID Didcot Parkway | 1 | 1013 | 1014 | 1014 | 1016 | +2 |
| SWI Swindon | 4 | 1028 | 1031 | 1031 | 1033 | +2 |
| BPW Bristol Parkway | 2 | 1054 | 1055 | 1056 | 1058 | +2 |
| NWP Newport (South Wales) | 2 | 1114 | 1115 | 1117 | 1119 | +4 |
| CDF Cardiff Central | 3 | 1128 | 1130 | 1131 | 1133 | +3 |
| BGN Bridgend | 1 | 1149 | 1150 | 1206 | 1208 | +18 |
| PTA Port Talbot Parkway | 1 | 1201 | 1202 | 1218 | 1219 | +17 |
| NTH Neath Pathed as Class 802 on diesel at 125mph from here | 1 | 1209 | 1210 | 1225 | 1226 | +16 |
| SWA Swansea | 3 | 1221 | 1232 | 1237 | 1245 | +13 |
| LLE Llanelli | 1 was DPL | 1248 | 1249 | 1301 | 1302 | +13 |
| PBY Pembrey & Burry Port | 2 | 1255 | 1256 | 1307 | 1308 | +12 |
| CMN Carmarthen | 2 | 1316 | 1327 | +11 |
Italic estimated timing, bold is actual.