3G62 0438 Bristol Parkway to Cheltenham Spa

TrainTimesLive
Menu Close menu

21st August 2026

04:38 – Bristol Parkway → Cheltenham Spa Arrived -2 Early operated by Great Western Railway

Empty coaching stock not available to passengers

Reported as far as Cheltenham Spa · 2 of 2 stops made · 39 of 39 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
BPW Bristol Parkway not advertised 4 0438 0442 +4
Westerleigh Junction pass 0443½0443½ pass0449 +6
YAE Yate pass 1 04480448 pass0450 +3
Charfield pass 04530453 pass0455 +2
Standish Junction pass 0505½0505½ pass0504 -1
Gloucester Yard Junction pass 0517½0517½ pass0510 -7
Barnwood Junction pass 05210521 pass0511 -10
CNM Cheltenham Spa not advertised 2 0527½0531 05170518 -13
XCX Alstone C. Sidings not advertised 05330548 05210546 -2
CNM Cheltenham Spa not advertised 1 0550 0548 -2

Italic estimated timing, bold is actual.