18th September 2026
04:38 – Bristol Parkway → Cheltenham Spa Arrived -10 Early operated by Great Western Railway
Empty coaching stock not available to passengers
Reported as far as Cheltenham Spa · 2 of 2 stops made · 39 of 39 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Bristol Parkway → Alstone C. Sidings
1 of 2
Alstone C. Sidings → Cheltenham Spa
2 of 2
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| BPW Bristol Parkway not advertised | 4 | 0438 | 0435 | -3 | ||
| Westerleigh Junction pass 2½ min pathing allowance | 0443½0443½ | pass0442 | -1 | |||
| YAE Yate pass ½ min pathing allowance | 1 | 04480448 | pass0443 | -4 | ||
| Charfield pass 4½ min pathing allowance | 04530453 | pass0448 | -5 | |||
| Standish Junction pass 1 min engineering, 6 min pathing allowance | 0505½0505½ | pass0457 | -8 | |||
| Gloucester Yard Junction pass 3 min pathing allowance | 0517½0517½ | pass0501 | -16 | |||
| Barnwood Junction pass 1 min pathing allowance | 05210521 | pass0505 | -16 | |||
| CNM Cheltenham Spa not advertised operational stop | 2 | 0527½0531 | 05140520 | -11 | ||
| XCX Alstone C. Sidings not advertised reverses here | 05330548 | 05220539 | -9 | |||
| CNM Cheltenham Spa not advertised | 1 | 0550 | 0540 | -10 | ||
Italic estimated timing, bold is actual.