5G93 0045 Cheltenham Spa to Gloucester Carriage Sdgs

TrainTimesLive
Menu Close menu

23rd September 2026

00:45 – Cheltenham Spa → Gloucester Carriage Sdgs Arrived -26 Early operated by Great Western Railway

Empty coaching stock not available to passengers

Reported as far as Gloucester Carriage Sdgs · 1 of 1 stop made · 8 of 8 miles

Formation Class 165

Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
CNM Cheltenham Spa not advertised 2 0045 0044 -1
XCX Alstone C. Sidings not advertised operational stop, reverses here 00470050 00470049 -1
CNM Cheltenham Spa pass 1 00520052 pass0050 -1
Barnwood Junction pass 1½ min pathing allowance MLLine 00580058 pass0056 -2 ML
Horton Road Junction pass 01020102 pass0101 -1
GCR Gloucester not advertised operational stop, reverses here, crew changed 4 01030121 no reportno report
Gloucester Ground SIG 444 not advertised operational stop, reverses here 01230126 no reportno report
Gloucester Carriage Sdgs not advertised 0128 0102 -26

Italic estimated timing, bold is actual.