5B16 2032 Cheltenham Spa to Cheltenham Spa

TrainTimesLive
Menu Close menu

13th September 2026

20:32 – Cheltenham Spa → Cheltenham Spa Arrived -2 Early operated by Great Western Railway

Empty coaching stock not available to passengers

Reported as far as Cheltenham Spa · 2 of 2 stops made · 1 of 1 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
CNM Cheltenham Spa not advertised 2 2032 2034 +2
XCX Alstone C. Sidings not advertised reverses here, waits for another train to pass 20342055 20362054 -1
CNM Cheltenham Spa not advertised 1 2057 2055 -2

Italic estimated timing, bold is actual.