29th August 2026
22:34 – Cheltenham Spa → Gloucester Carriage Sdgs Arrived On time operated by Great Western Railway
Empty coaching stock not available to passengers
Reported as far as Gloucester Carriage Sdgs · 1 of 1 stop made · 8 of 8 miles
Formation Class 158 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spaces
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| CNM Cheltenham Spa not advertised | 1 was 2 | 2234 | 22342234 | -7 | ||
| XCX Alstone C. Sidings not advertised operational stop, reverses here | 22362239 | 22332233 | -3 | |||
| CNM Cheltenham Spa pass | 1 | 22412241 | passno report | |||
| Barnwood Junction pass MLLine | 2246½2246½ | pass2240 | -6 | ML | ||
| Horton Road Junction pass | 2248½2248½ | pass2242 | -6 | |||
| GCR Gloucester not advertised operational stop, reverses here, crew changed | 4 | 22502327 | 22442321 | -6 | ||
| Gloucester Ground SIG 454 not advertised operational stop, reverses here | 23282331 | no reportno report | ||||
| Gloucester Carriage Sdgs not advertised | 2332 | 2332 | ·on time | |||
Italic estimated timing, bold is actual.