28th October 2026
23:36 – Cheltenham Spa → Bristol Parkway Arrived time not reported -7 Early operated by Great Western Railway
Empty coaching stock not available to passengers
diesel for 55 min · electric from Bristol Parkway for 0 min
Reported as far as Westerleigh Junction · 1 of 2 stops made · 35 of 39 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Cheltenham Spa → Alstone C Sidings
1 of 2
Alstone C Sidings → Bristol Parkway
2 of 2
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| CNM Cheltenham Spa not advertised | 2 | 2336 | 2345 | +9 | ||
| XCX Alstone C Sidings not advertised reverses here | 23382347 | 23472353 | +6 | |||
| CNM Cheltenham Spa pass | 1 | 23492349 | pass2354 | +5 | ||
| Barnwood Junction pass | 23552355 | pass2359 | +4 | |||
| Gloucester Yard Junction pass | 23562356 | pass2359 | +3 | |||
| Standish Junction pass 2 min pathing allowance | 0001½0001½ | pass0003 | +2 | |||
| Charfield pass 3 min pathing allowance | 0011½0011½ | pass0012 | +1 | |||
| YAE Yate pass 5 min pathing allowance | 2 | 0018½0018½ | pass0016 | -1 | ||
| Westerleigh Junction pass | 0025½0025½ | pass0018 | -7 | |||
| BPW Bristol Parkway not advertised Pathed as Class 802 on electric at 125mph from here | 4 | 0031 | 0231 | |||
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.