5G33 2336 Cheltenham Spa to Stoke Gifford

TrainTimesLive
Menu Close menu

2nd November 2026

23:36 – Cheltenham Spa → Stoke Gifford Arrived +16 Late operated by Great Western Railway

Empty coaching stock not available to passengers

diesel for 54 min · electric from Bristol Parkway for 3 min

Reported as far as Stoke Gifford · 1 of 1 stop made · 40 of 40 miles

Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
CNM Cheltenham Spa not advertised 2 2336 2342 +6
XCX Alstone C Sidings not advertised reverses here 23382347 23442352 +5
CNM Cheltenham Spa pass 1 23492349 pass2353 +4
Barnwood Junction pass 23552355 pass2358 +3
Gloucester Yard Junction pass 23562356 pass2358 +2
Standish Junction pass 2 min pathing allowance 0001½0001½ pass0004 +3
Charfield pass 3 min pathing allowance 0011½0011½ pass0013 +2
YAE Yate pass 2 min pathing allowance 2 0018½0018½ pass0019 +1
Westerleigh Junction pass ½ min pathing allowance 0022½0022½ pass0026 +4
BPW Bristol Parkway not advertised operational stop, crew changed Pathed as Class 802 on electric at 125mph from here 2 00280030 00330046 +16
Stoke Gifford not advertised 0033 0049 +16

Italic estimated timing, bold is actual.