18th September 2026
21:53 – Cardiff Central → Cardiff Canton Sidings Cancelled — Delays not investigated by Network Rail operated by Transport for Wales
Empty coaching stock not available to passengers
Reported as far as Cardiff Central · 1 of 2 stops made · 0 of 1 miles
Formation Class 756
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| CDF Cardiff Central not advertised DRLine | 7 | 2153 | 2152 | -1 | DR | |
| XCC Cardiff Canton Sidings not advertised | 2205 | 2204 | ||||
Italic estimated timing, bold is actual.