This is the 2B10 1500 Cheltenham Spa to Swindon on 13th September 2026. See today's trains from Cheltenham Spa around 1500 →
13th September 2026 Simple View
2B10 · 15:00 – Cheltenham Spa → Swindon Arrived +1 Late operated by Great Western Railway
WTTThe permanent working timetable Pathed as Class 802 on diesel at 125mph
Reported as far as Swindon · 6 of 6 stops made · 43 of 43 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Cheltenham Spa → Gloucester
1 of 2
Gloucester → Swindon
2 of 2
Calling pattern
| Formed from 5B10 from Cheltenham Spa arrived 14:56 empty stock 800034 | |||||||
| Public | Working | Actual | Route | ||||
|---|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | arrdep | Status | Line | Path |
| CNM Cheltenham Spa | 1 | 1500 | 1500 | 1459 | -1 | ||
| Barnwood Junction pass MLLine | pass1506½ | pass1506 | ·on time | ML | |||
| Horton Road Junction pass | pass1507½ | pass1507 | ·on time | ||||
| GCR Gloucester reverses here | 1 was 2 | 15091513 | 1508½1515 | 15081515 | ·on time | ||
| Horton Road Junction pass | pass1516 | pass1516 | ·on time | ||||
| Gloucester Yard Junction pass | pass1517 | pass1517 | ·on time | ||||
| Standish Junction pass | pass1523 | pass1525 | +2 | ||||
| SHU Stonehouse | 1 | 15261526 | 1525½1526½ | 15271529 | +3 | ||
| STD Stroud | 1 | 15301531 | 15301531 | 15321534 | +3 | ||
| St Mary's Level Crossing pass | pass1535½ | pass1538 | +3 | ||||
| KEM Kemble 1 min engineering allowance | 1 | 15451546 | 15451546 | 15471548 | +2 | ||
| Rodbourne Junction pass | pass1556½ | passno report | |||||
| SWI Swindon | 1 | 1559 | 1559 | 1600 | +1 | ||
| Forms 5G10 to Swindon departs 16:03 empty stock 800034 | |||||||
Italic estimated timing, bold is actual.