2B10 1500 Cheltenham Spa to Swindon

TrainTimesLive
Menu Close menu

This is the 2B10 1500 Cheltenham Spa to Swindon on 13th September 2026. See today's trains from Cheltenham Spa around 1500 →

13th September 2026 Simple View

2B10 · 15:00 – Cheltenham Spa → Swindon Arrived +1 Late operated by Great Western Railway

WTTThe permanent working timetable Pathed as Class 802 on diesel at 125mph

Reported as far as Swindon · 6 of 6 stops made · 43 of 43 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 5B10 from Cheltenham Spa arrived 14:56 empty stock 800034
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
CNM Cheltenham Spa 1 1500 1500 1459 -1
Barnwood Junction pass MLLine pass1506½ pass1506 ·on time ML
Horton Road Junction pass pass1507½ pass1507 ·on time
GCR Gloucester reverses here 1 was 2 15091513 1508½1515 15081515 ·on time
Horton Road Junction pass pass1516 pass1516 ·on time
Gloucester Yard Junction pass pass1517 pass1517 ·on time
Standish Junction pass pass1523 pass1525 +2
SHU Stonehouse 1 15261526 1525½1526½ 15271529 +3
STD Stroud 1 15301531 15301531 15321534 +3
St Mary's Level Crossing pass pass1535½ pass1538 +3
KEM Kemble 1 min engineering allowance 1 15451546 15451546 15471548 +2
Rodbourne Junction pass pass1556½ passno report
SWI Swindon 1 1559 1559 1600 +1
Forms 5G10 to Swindon departs 16:03 empty stock 800034

Italic estimated timing, bold is actual.