06:33 Peterborough to Doncaster
2K90EMR06:33 – Peterborough → Doncaster Planned operated by East Midlands Railway
Journey
Planned timetable for a future date. No actual times, and no formation: which units work a train is not decided this far ahead.
Calling points Detailed view
| PlannedThe advertised timetable: the times passengers are given, to the minute. | LiveUp to where the train is now, the times it was reported. Beyond it, the times it is expected, in italics. Updates every 30 seconds. | |||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | Arr | Dep | Arr | Dep | Late |
| PBO Peterborough | 2 | 06:33 | ||||
| SPA Spalding | 2 | 06:52 | 06:52 | |||
| SLR Sleaford | 1 | 07:13 | 07:13 | |||
| RKT Ruskington | 07:21 | 07:21 | ||||
| MGM Metheringham | 07:30 | 07:30 | ||||
| LCN Lincoln | 4 | 07:44 | 07:47 | |||
| SXY Saxilby | 07:55 | 07:56 | ||||
| GBL Gainsborough Lea Road | 08:08 | 08:09 | ||||
| DON Doncaster | 2 | 08:35 | ||||