27th September 2026 Follow Detailed View
11:00 – Bristol Temple Meads → London Paddington Planned operated by Great Western Railway
diesel for 26 min · electric from Chippenham for 1h15
Not yet reported
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| BRI Bristol Temple Meads | 13 | 1100 | ||||
| BTH Bath Spa | 2 | 1111 | 1113 | |||
| CPM Chippenham Pathed as Class 802 on electric at 125mph from here | 2 | 1124 | 1126 | |||
| SWI Swindon | 3 | 1138 | 1140 | |||
| DID Didcot Parkway | 2 | 1155 | 1156 | |||
| RDG Reading | 10 | 1209 | 1213 | |||
| PAD London Paddington | 5 | 1241 |
Italic estimated timing, bold is actual.