27th September 2026 Follow Detailed View
10:47 – Cheltenham Spa → London Paddington En route +1 Late operated by Great Western Railway
diesel for 1h03 · electric from Swindon for 56 min
Reported as far as Gloucester Yard Junction · 2 of 8 stops made · 8 of 120 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Cheltenham Spa → Gloucester
1 of 2
Gloucester → London Paddington
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CNM Cheltenham Spa | 1 | 1047 | 1048 | +1 | ||
| GCR Gloucester | 1 was 2 | 1056 | 1103 | 1056 | 1103 | ·on time |
| SHU Stonehouse | 1 | 1113 | 1114 | 1113 | 1114 | |
| STD Stroud | 1 | 1119 | 1119 | 1119 | 1119 | |
| KEM Kemble | 1 | 1134 | 1134 | 1134 | 1134 | |
| SWI Swindon Pathed as Class 802 on electric at 125mph from here | 3 | 1148 | 1150 | 1148 | 1150 | |
| RDG Reading | 10 | 1217 | 1218 | 1217 | 1218 | |
| PAD London Paddington | 3 | 1246 | 1246 |
Italic estimated timing, bold is actual.