27th September 2026 Follow Detailed View
09:50 – Swansea → London Paddington Planned operated by Great Western Railway
diesel for 1h30 · electric from Cardiff Central for 1h55
Not yet reported
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| SWA Swansea | 3 | 0950 | ||||
| NTH Neath | 1001 | 1002 | ||||
| PTA Port Talbot Parkway | 2 | 1008 | 1009 | |||
| BGN Bridgend | 1 | 1021 | 1022 | |||
| CDF Cardiff Central Pathed as Class 802 on electric at 125mph from here | 1 | 1111 | 1120 | |||
| NWP Newport (South Wales) | 3 | 1130 | 1133 | |||
| BPW Bristol Parkway | 3 | 1153 | 1155 | |||
| SWI Swindon | 3 | 1217 | 1219 | |||
| RDG Reading | 10 | 1244 | 1248 | |||
| PAD London Paddington | 11 | 1315 |
Italic estimated timing, bold is actual.