2G02 1017 Swindon to Cheltenham Spa

TrainTimesLive
Menu Close menu

This is the 2G02 1017 Swindon to Cheltenham Spa on 13th September 2026. See today's trains from Swindon around 1017 →

13th September 2026 Simple View

2G02 · 10:17 – Swindon → Cheltenham Spa Arrived +3 Late operated by Great Western Railway

WTTThe permanent working timetable Pathed as Class 802 on diesel at 125mph

Reported as far as Cheltenham Spa · 6 of 6 stops made · 43 of 43 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 5G02 from Stoke Gifford arrived 10:04 empty stock 800034
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
SWI Swindon UKLine 1 1017 1017 1017 ·on time UK
Rodbourne Junction pass pass1019½ passno report
KEM Kemble 2 10291029 1028½1029½ 10291030 +1
St Mary's Level Crossing pass pass1039½ pass1039 ·on time
STD Stroud 2 10441044 1043½1044½ 10431047 +3
SHU Stonehouse 2 10481049 10481049 10501051 +2
Standish Junction pass 1 min engineering allowance pass1051½ pass1054 +3
Gloucester Yard Junction pass pass1057½ pass1100 +3
Horton Road Junction pass pass1058½ passno report
GCR Gloucester reverses here 4 11001108 11001108 11041109 +1
Horton Road Junction pass MLLine pass1109½ pass1111 +2 ML
Barnwood Junction pass pass1110½ pass1112 +2
CNM Cheltenham Spa 2 1116 1116 1119 +3
Forms 5B07 to Cheltenham Spa departs 11:20 empty stock 800034

Italic estimated timing, bold is actual.