5N60 2130 York and Hexham to Heaton T&RSMD

TrainTimesLive
Menu Close menu

18th November 2026

21:30 – York and Hexham → Heaton T&RSMD En route -3 Early operated by Northern

Empty coaching stock not available to passengers

Reported as far as Tollerton Junction · 1 of 3 stops made · 10 of 83 miles

Formation Classes 158, 156 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spaces

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
YRK York not advertised 6 was 7 2130 2135 +5
York Loop (Holgate) not advertised operational stop, reverses here 21332145 2136 +3
YRK York not advertised operational stop 10 21482156½ 21452152 -4
Skelton Junction (York) pass SLLine 21592159 pass2155 -4 SL
Tollerton Junction pass SLLine 2207½2207½ pass2204 -3 SL
THI Thirsk pass SLLine 2 2218½2218½ pass2216 SL
Longlands Junction not advertised operational stop 22242232½ 22212222
NTR Northallerton pass 1 min performance allowance 22342234 pass2224
DAR Darlington pass DML 22452245 pass2235
Ferryhill Sth. Junction pass 2254½2254½ pass2244
Tursdale Junction pass 2256½2256½ pass2246
DHM Durham pass DM 2301½2301½ pass2251
Birtley Junction pass 15 min engineering, 1 min pathing allowance 2308½2308½ pass2258
King Edward Bridge S Junction pass 1 min pathing allowance 2327½2327½ pass2301
NCL Newcastle not advertised operational stop Service joins 2N70 from Hexham 156449 SLLine 7 23310034 23042305 SL
Heaton Sth. Junction pass 00400040 pass2311
XHT Heaton T&RSMD not advertised 0044 2315

Italic estimated timing, bold is actual.