06:10 Maidenhead Carriage Sdgs to Maidenhead
5N29Empty coaching stockElizabeth5N29 · 06:10 – Maidenhead Carriage Sdgs → Maidenhead Arrived -2 Early operated by Elizabeth line
Journey
WTTThe permanent working timetableMore in the glossary Pathed as Class 345 on electric at 90 mph
Reported as far as Maidenhead · 2 of 2 stops made · 0 of 0 miles
Carriages 9
Calling points Timing points only — this train makes no public stops
| WorkingThe railway's own timetable, to the half minute: what drivers and signallers run to. It lists every junction and station the train passes, and can differ from the planned time by a minute or so. | LiveUp to where the train is now, the times it was reported. Beyond it, the times it is expected, in italics. Updates every 30 seconds. | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | ArrDep | ArrDep | Late | Line | Path |
| Maidenhead Carriage Sdgs not advertised RLLine | 06:10 | 06:09 | -1 | RL | ||
| MAI Maidenhead not advertised | 4 | 06:12 | 06:10 | -2 | ||
| Forms 9U29 to Abbey Wood (Elizabeth line) departs 06:13 345036 | ||||||