This is the 1A25 1300 Paignton to London Paddington on 5th September 2026. See today's trains from Paignton around 1300 →
5th September 2026 Detailed View
13:00 – Paignton → London Paddington Partially cancelled — Fires starting on Network Rail Infrastructure operated by Great Western Railway
Planned diversion. Calling at Bristol Temple Meads, Bath Spa, Chippenham, Swindon and Didcot Parkway, which this service does not normally serve.
This service was cancelled between Paignton and London Paddington. This service has been cancelled because of failure of the electricity supply.
Reported as far as Reading · 12 of 15 stops made, 3 cancelled · 186 of 222 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| PGN Paignton | 2 | 1300 | Cancelled | |||
| TQY Torquay | 1305 | 1306 | Cancelled | |||
| NTA Newton Abbot | 1 was 3 | 1314 | 1316 | 1315 | -1 | |
| TGM Teignmouth | 2 | 1322 | 1323 | 1321 | 1323 | ·on time |
| DWL Dawlish | 2 | 1327 | 1328 | 1327 | 1328 | ·on time |
| DWW Dawlish Warren | 2 | 1332 | 1343 | 1331 | 1342 | -1 |
| EXD Exeter St Davids | 5 | 1356 | 1400 | 1354 | 1404 | +4 |
| TAU Taunton | 5 | 1422 | 1424 | 1431 | 1441 | +17 |
| BRI Bristol Temple Meads | 15 was 11 | 1455 | 1500 | 1522 | 1525 | +25 |
| BTH Bath Spa | 2 | 1511 | 1513 | 1538 | 1540 | +27 |
| CPM Chippenham | 2 | 1524 | 1526 | 1552 | 1554 | +28 |
| SWI Swindon | 1 was 3 | 1538 | 1540 | 1607 | 1609 | +29 |
| DID Didcot Parkway | 2 | 1555 | 1557 | 1625 | 1626 | +29 |
| RDG Reading | 8 was 10 | 1610 | 1612 | 1638 | +29 | |
| PAD London Paddington | 5 | 1643 | Cancelled |
Italic estimated timing, bold is actual.