26th September 2026 Follow Detailed View
11:47 – Swansea → London Paddington Planned operated by Great Western Railway
diesel for 1h33 · electric from Cardiff Central for 1h52
Not yet reported
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| SWA Swansea | 3 | 1147 | ||||
| NTH Neath | 1158 | 1159 | ||||
| PTA Port Talbot Parkway | 2 | 1205 | 1206 | |||
| BGN Bridgend | 1 | 1219 | 1220 | |||
| CDF Cardiff Central Pathed as Class 802 on electric at 125mph from here | 2 | 1314 | 1320 | |||
| NWP Newport (South Wales) | 3 | 1331 | 1333 | |||
| BPW Bristol Parkway | 3 | 1353 | 1357 | |||
| SWI Swindon | 1 | 1419 | 1421 | |||
| RDG Reading | 10 | 1446 | 1448 | |||
| PAD London Paddington | 8 | 1512 |
Italic estimated timing, bold is actual.