1L64 0649 Cheltenham Spa to London Paddington

TrainTimesLive
Menu Close menu

This is the 1L64 0649 Cheltenham Spa to London Paddington on 29th August 2026. See today's trains from Cheltenham Spa around 0649 →

29th August 2026 Detailed View

06:49 – Cheltenham Spa → London Paddington Arrived +2 Late operated by Great Western Railway

Planned diversion. Calling at Didcot Parkway, which this service does not normally serve.

diesel for 1h15 · electric from Swindon for 55 min

Reported as far as London Paddington · 9 of 9 stops made · 120 of 120 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
CNM Cheltenham Spa 1 0649 0650 +1
GCR Gloucester 4 0659 0711 0700 0710 -1
SHU Stonehouse 1 0724 0725 0722 0725 ·on time
STD Stroud 1 0729 0731 0729 0732 +1
KEM Kemble 1 0745 0747 0744 0747 ·on time
SWI Swindon Pathed as Class 802 on electric at 125mph from here 3 0800 0804 0759 0804 ·on time
DID Didcot Parkway 2 0820 0821 0819 0821 ·on time
RDG Reading 11 was 10 0834 0835 0833 0836 +1
PAD London Paddington 2 0859 0901 +2

Italic estimated timing, bold is actual.