1N77 2002 Oxford to Bristol Temple Meads

TrainTimesLive
Menu Close menu

This is the 1N77 2002 Oxford to Bristol Temple Meads on 5th September 2026. See today's trains from Oxford around 2002 →

5th September 2026 Detailed View

20:02 – Oxford → Bristol Temple Meads Arrived +25 Late operated by Great Western Railway

This service has been delayed by failure of the electricity supply.

diesel for 48 min · electric for 23 min

Reported as far as Bristol Temple Meads · 5 of 5 stops made · 75 of 75 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
OXF Oxford 4 2002 2010 +8
SWI Swindon Pathed as Class 802 on electric at 125mph from here 4 2034 2036 2100 2102 +26
CPM Chippenham Pathed as Class 802 on diesel at 125mph from here 1 2046 2047 2113 2114 +27
BTH Bath Spa 1 2059 2100 2125 2127 +27
BRI Bristol Temple Meads 13 2113 2138 +25

Italic estimated timing, bold is actual.