1P40 1900 Great Malvern to London Paddington

TrainTimesLive
Menu Close menu

This is the 1P40 1900 Great Malvern to London Paddington on 26th September 2026. See today's trains from Great Malvern around 1900 →

26th September 2026 Detailed View

19:00 – Great Malvern → London Paddington Arrived +7 Late operated by Great Western Railway

This service has been delayed by a fault with the signalling system.

diesel for 1h45 · electric from Didcot Parkway for 39 min

Reported as far as London Paddington · 16 of 16 stops made · 130 of 130 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
GMV Great Malvern 1900 1900 ·on time
MVL Malvern Link 1903 1904 1902 1904 ·on time
WOF Worcester Foregate Street 1 1913 1915 1913 1916 +1
WOS Worcester Shrub Hill 2 1918 1919 1918 1920 +1
WPH Worcestershire Parkway (High Level) 1924 1925 1925 1926 +1
PSH Pershore 1930 1930 1930 1931 +1
EVE Evesham 1937 1938 1937 1939 +1
HYB Honeybourne 2 1944 1944 1945 1946 +2
MIM Moreton-in-Marsh 2 1955 1956 1958 2000 +4
KGM Kingham 2003 2004 2007 2008 +4
CBY Charlbury 2 2012 2013 2015 2016 +3
HND Hanborough 2020 2021 2022 2023 +2
OXF Oxford 3 2030 2032 2032 2034 +2
DID Didcot Parkway Pathed as Class 802 on electric at 125mph from here 4 2044 2045 2048 2049 +4
RDG Reading 10 2058 2100 2101 2102 +2
PAD London Paddington 1 2124 2131 +7

Italic estimated timing, bold is actual.