This is the 2C81 1459 Cardiff Central to Exeter St Davids on 7th November 2026. See today's trains from Cardiff Central around 1459 →
7th November 2026 Detailed View
14:59 – Cardiff Central → Exeter St Davids Arrived +3 Late operated by Great Western Railway
electric for 39 min · diesel from Patchway for 1h53
Reported as far as Exeter St Davids · 16 of 16 stops made · 114 of 114 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CDF Cardiff Central | 1 | 1459 | 1458 | -1 | ||
| NWP Newport (South Wales) | 3 | 1511 | 1512 | 1511 | 1513 | +1 |
| STJ Severn Tunnel Junction | 4 | 1522 | 1523 | 1522 | 1523 | ·on time |
| PIL Pilning | 1 | 1530 | 1531 | 1530 | 1532 | +1 |
| PWY Patchway Pathed as Class 802 on diesel at 125mph from here | 1 | 1537 | 1538 | 1535 | 1537 | -1 |
| FIT Filton Abbey Wood | 3 | 1541 | 1542 | 1540 | 1541 | -1 |
| BRI Bristol Temple Meads Pathed as Class 802 on diesel at 125mph from here | 10 | 1551 | 1558 | 1549 | 1602 | +4 |
| NLS Nailsea & Backwell | 1 | 1607 | 1608 | 1610 | 1612 | +4 |
| YAT Yatton | 1 | 1612 | 1613 | 1616 | 1617 | +4 |
| WOR Worle | 1 | 1618 | 1619 | 1622 | 1624 | +5 |
| WSM Weston-super-Mare | 2 | 1625 | 1626 | 1629 | 1631 | +5 |
| HIG Highbridge & Burnham | 1 | 1637 | 1637 | 1640 | 1643 | +6 |
| BWT Bridgwater | 1 | 1644 | 1645 | 1649 | 1653 | +8 |
| TAU Taunton | 2 | 1655 | 1700 | 1703 | 1704 | +4 |
| TVP Tiverton Parkway | 1 | 1712 | 1713 | 1717 | 1718 | +5 |
| EXD Exeter St Davids | 6 | 1731 | 1734 | +3 |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.