This is the 2U24 1549 Exeter St Davids to Cardiff Central on 8th November 2026. See today's trains from Exeter St Davids around 1549 →
8th November 2026 Detailed View
15:49 – Exeter St Davids → Cardiff Central Arrived On time operated by Great Western Railway
This service has been delayed by a late running train being in front of this one.
diesel for 1h37 · electric from Patchway for 34 min
Reported as far as Cardiff Central · 15 of 15 stops made · 113 of 113 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| EXD Exeter St Davids | 4 | 1549 | 1548 | -1 | ||
| TVP Tiverton Parkway | 2 | 1603 | 1603 | 1602 | 1603 | ·on time |
| TAU Taunton | 5 | 1615 | 1616 | 1615 | 1616 | ·on time |
| BWT Bridgwater | 2 | 1625 | 1626 | 1625 | 1629 | +3 |
| HIG Highbridge & Burnham | 2 | 1632 | 1633 | 1635 | 1637 | +4 |
| WSM Weston-super-Mare | 2 | 1643 | 1645 | 1646 | 1648 | +3 |
| WOR Worle | 2 | 1650 | 1651 | 1652 | 1654 | +3 |
| YAT Yatton | 2 | 1656 | 1657 | 1659 | 1700 | +3 |
| NLS Nailsea & Backwell | 2 | 1702 | 1703 | 1705 | 1706 | +3 |
| BRI Bristol Temple Meads Pathed as Class 802 on diesel at 125mph from here | 5 | 1712 | 1715 | 1714 | 1717 | +2 |
| FIT Filton Abbey Wood | 2 | 1721 | 1722 | 1723 | 1723 | +2 |
| PWY Patchway Pathed as Class 802 on electric at 125mph from here | 2 | 1726 | 1726 | 1726 | 1727 | +1 |
| STJ Severn Tunnel Junction | 3 | 1736 | 1736 | 1736 | 1737 | +1 |
| NWP Newport (South Wales) | 2 | 1745 | 1746 | 1746 | 1748 | +1 |
| CDF Cardiff Central | 4B | 1800 | 1800 | ·on time |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.