This is the 2U22 1522 Taunton to Cardiff Central on 12th September 2026. See today's trains from Taunton around 1522 →
12th September 2026 Detailed View
15:22 – Taunton → Cardiff Central Arrived -1 Early operated by Great Western Railway
diesel for 1h12 · electric from Patchway for 34 min
Reported as far as Cardiff Central · 13 of 13 stops made · 83 of 83 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| TAU Taunton | 6 | 1522 | 1522 | ·on time | ||
| BWT Bridgwater | 2 | 1532 | 1532 | 1532 | 1534 | +2 |
| HIG Highbridge & Burnham | 2 | 1539 | 1539 | 1540 | 1541 | +2 |
| WSM Weston-super-Mare | 2 was 1 | 1549 | 1550 | 1551 | 1553 | +3 |
| WOR Worle | 2 | 1555 | 1556 | 1557 | 1558 | +2 |
| YAT Yatton | 2 | 1601 | 1602 | 1603 | 1604 | +2 |
| NLS Nailsea & Backwell | 2 | 1607 | 1608 | 1609 | 1610 | +2 |
| BRI Bristol Temple Meads Pathed as Class 802 on diesel at 125mph from here | 3 | 1618 | 1622 | 1620 | 1623 | +1 |
| FIT Filton Abbey Wood | 4 | 1629 | 1630 | 1629 | 1630 | ·on time |
| PWY Patchway Pathed as Class 802 on electric at 125mph from here | 2 | 1633 | 1634 | 1633 | 1634 | ·on time |
| STJ Severn Tunnel Junction | 3 | 1643 | 1644 | 1643 | 1644 | ·on time |
| NWP Newport (South Wales) | 2 | 1653 | 1655 | 1653 | 1655 | ·on time |
| CDF Cardiff Central | 3 | 1708 | 1707 | -1 |
Italic estimated timing, bold is actual.