2G15 2130 Swindon to Cheltenham Spa

TrainTimesLive
Menu Close menu

27th September 2026 Detailed View

21:30 – Swindon → Cheltenham Spa Planned operated by Great Western Railway

Not yet reported

Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
SWI Swindon 1 2130
KEM Kemble 2 2142 2143
STD Stroud 2 2157 2158
SHU Stonehouse 2 2202 2202
GCR Gloucester 4 2218 2225
CNM Cheltenham Spa 2 2233

Italic estimated timing, bold is actual.