This is the 2G09 1524 Swindon to Cheltenham Spa on 20th September 2026. See today's trains from Swindon around 1524 →
20th September 2026 Detailed View
15:24 – Swindon → Cheltenham Spa Cancelled — Signal failure (including no fault found) operated by Great Western Railway
Not yet reported
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Swindon → Gloucester
1 of 2
Gloucester → Cheltenham Spa
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| SWI Swindon | 1 | 1524 | ||||
| KEM Kemble | 2 | 1535 | 1536 | |||
| STD Stroud | 2 | 1550 | 1555 | |||
| SHU Stonehouse | 2 | 1558 | 1559 | |||
| GCR Gloucester | 2 | 1614 | 1620 | |||
| CNM Cheltenham Spa | 2 | 1629 |
Italic estimated timing, bold is actual.