2B09 1400 Cheltenham Spa to Swindon

TrainTimesLive
Menu Close menu

This is the 2B09 1400 Cheltenham Spa to Swindon on 13th September 2026. See today's trains from Cheltenham Spa around 1400 →

13th September 2026 Simple View

2B09 · 14:00 – Cheltenham Spa → Swindon Arrived -1 Early operated by Great Western Railway

WTTThe permanent working timetable Pathed as Class 802 on diesel at 125mph

Reported as far as Swindon · 6 of 6 stops made · 43 of 43 miles

Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 5B09 from Cheltenham Spa arrived 13:57 empty stock 802007
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
CNM Cheltenham Spa 1 1400 1400 1359 -1
Barnwood Junction pass MLLine pass1406½ pass1406 ·on time ML
Horton Road Junction pass pass1407½ pass1407 ·on time
GCR Gloucester reverses here 1 was 2 14091417 1408½1419 14081417 -2
Horton Road Junction pass pass1420 pass1418 -2
Gloucester Yard Junction pass pass1421 pass1419 -2
Standish Junction pass pass1427 pass1426 -1
SHU Stonehouse 1 14301430 1429½1430½ 14281430 ·on time
STD Stroud 1 14341435 14341435½ 14341436 +1
St Mary's Level Crossing pass pass1440 pass1439 -1
KEM Kemble 1 min engineering allowance 1 14501450 1449½1450½ 14481450 ·on time
Rodbourne Junction pass pass1501 passno report
SWI Swindon 1 1503 1503 1502 -1
Forms 2G09 to Cheltenham Spa departs 15:24 802007

Italic estimated timing, bold is actual.