2B09 1400 Cheltenham Spa to Swindon

TrainTimesLive
Menu Close menu

This is the 2B09 1400 Cheltenham Spa to Swindon on 22nd November 2026. See today's trains from Cheltenham Spa around 1400 →

22nd November 2026 Detailed View

14:00 – Cheltenham Spa → Swindon Arrived On time operated by Great Western Railway

Reported as far as Swindon · 6 of 6 stops made · 43 of 43 miles

Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
CNM Cheltenham Spa 1 1400 1359 -1
GCR Gloucester 1 was 2 1409 1417 1408 1419 ·on time
SHU Stonehouse 1 1430 1430 1430 1431 +1
STD Stroud 1 1434 1435 1435 1437 +2
KEM Kemble 1 1450 1450 1450 1452 +2
SWI Swindon 1 1503 1503 ·on time

Italic estimated timing, bold is actual.