28th August 2026
22:42 – London Paddington and Basingstoke → Reading Traincare Depot Arrived -8 Early operated by Great Western Railway
Empty coaching stock not available to passengers
Reported as far as Reading Traincare Depot · 2 of 2 stops made · 37 of 37 miles
Formation Class 165
London Paddington → Reading
1 of 2
Reading → Reading Traincare Depot
2 of 2
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| PAD London Paddington not advertised 3Line | 9 was 11 | 2242 | 2241 | -1 | 3 | |
| Royal Oak Junction pass 2Line | 22432243 | pass2243 | ·on time | 2 | ||
| Portobello Junction (London) pass 2Line | 22442244 | pass2244 | ·on time | 2 | ||
| Ladbroke Grove pass MLLine2Path | 22452245 | pass2245 | ·on time | ML | 2 | |
| Acton West pass 2½ min pathing allowance MLLineMLPath | 2248½2248½ | pass2248 | ·on time | ML | ML | |
| STL Southall pass MLLine | 1 | 2253½2253½ | pass2255 | +2 | ML | |
| Heathrow Airport Junction pass MLLine | 22552255 | pass2257 | +2 | ML | ||
| SLO Slough pass MLLine | 2 | 23002300 | pass2304 | +4 | ML | |
| Slough West pass RLLine | 2300½2300½ | passno report | RL | |||
| MAI Maidenhead pass RLLine | 3 | 2305½2305½ | pass2312 | +8 | RL | |
| TWY Twyford pass 1 min engineering, 4½ min pathing allowance RLLine | 3 | 23112311 | pass2317 | +6 | RL | |
| Kennet Bridge Junction pass DRLLine | 23202320 | pass2320 | ·on time | DRL | ||
| RDG Reading not advertised operational stop, crew changed, Service gains coaches here Service joins 2J76 from Basingstoke 165107 1 min pathing allowance | 14 | 23222330 | 23242324 | +2 | ||
| Reading Depot Entry C not advertised operational stop | 23342335 | no reportno report | ||||
| Reading Traincare Depot not advertised | 2336 | 2328 | -8 | |||
Italic estimated timing, bold is actual.