5P65 2040 Newton Abbot to Laira T& RSMD

TrainTimesLive
Menu Close menu

7th November 2026

20:40 – Newton Abbot → Laira T& RSMD Arrived -16 Early operated by Great Western Railway

Empty coaching stock not available to passengers

Reported as far as Laira T& RSMD · 2 of 2 stops made · 34 of 34 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
NTA Newton Abbot not advertised 1 2040 2030 -10
Newton Abbot West Junction pass 1 min performance allowance 2041½2041½ pass2031 -10
Dainton Tunnel pass 2½ min pathing allowance 20462046 pass2035 -11
TOT Totnes pass 20542054 pass2040 -14
Rattery pass 1½ min pathing allowance D 20592059 pass2046 -13
Aish Emergency Crossover pass D 2103½2103½ pass2048 -15
IVY Ivybridge pass 1 2107½2107½ pass2052 -14
Hemerdon pass D 21122112 pass2057 -15
Tavistock Junction pass 1 min engineering allowance D 21152115 pass2100 -15
Lipson Junction pass 2117½2117½ pass2102 -15
PLY Plymouth not advertised operational stop, reverses here, crew changed 6 21202200 21052204 +4
Lipson Junction pass 2203½2203½ pass2208 +5
XMG Mount Gould Junction pass 22062206 pass2212 -17
Mount Gould Platform not advertised operational stop, reverses here 22072222 2213 -9
XMG Mount Gould Junction pass 22402240 pass2224 -16
XLZ Laira T& RSMD not advertised 2242 2226 -16

Italic estimated timing, bold is actual.