2K26 1757 Peterborough to Lincoln

TrainTimesLive
Menu Close menu

This is the 2K26 1757 Peterborough to Lincoln on 28th August 2026. See today's trains from Peterborough around 1757 →

28th August 2026 Simple View

2K26 · 17:57 – Peterborough → Lincoln Arrived On time operated by East Midlands Railway

WTTThe permanent working timetable Pathed as Class 158/168/170/175 on diesel at 100mph

Reported as far as Lincoln · 6 of 6 stops made · 57 of 57 miles

Formation Class 170

Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Calling pattern, including passing points
Formed from 2K21 from Lincoln arrived 17:30 170532
Public Working Actual Route
Location PlatformPlat arrdep arrdep arrdep Status Line Path
PBO Peterborough USLLine 1 1757 1757 1756 -1 USL
Werrington Junction pass pass1802 pass1800 -2
Glinton Junction pass pass1803½ pass1802 -1
SPA Spalding 2 18161816 1815½1816½ 18161817 +1
Quadring Signal Ws7071 pass 1 min engineering allowance pass1823½ pass1823 ·on time
Sleaford South Junction pass pass1834 pass1834 ·on time
SLR Sleaford 2 18371837 1836½1837½ 18381839 +2
Sleaford North Junction pass pass1841½ pass1843 +2
RKT Ruskington 1 18451845 1844½1845½ 18461847 +2
MGM Metheringham 1 min engineering allowance 1 18541854 1853½1854½ 18561856 +3
Pelham Street Junction pass 1 min performance allowance pass1906 passno report
LCN Lincoln 5 1909 1908 1908 ·on time
Forms 2K60 to Doncaster departs 19:34 170532

Italic estimated timing, bold is actual.