27th September 2026 Follow Detailed View
18:28 – London Victoria → Gatwick Airport Cancelled — Fires starting on Network Rail Infrastructure operated by Gatwick Express
Not yet reported
Formation Class 387
How busy: 34% full. Darwin's own figure for the whole train, not per carriage, reported at London Victoria at 15:21.
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| VIC London Victoria | 14 | 1828 | Cancelled | |||
| GTW Gatwick Airport | 5 | 1858 | Cancelled |
Italic estimated timing, bold is actual.