22nd September 2026
20:31 – Chadwell Heath Turnback → London Liverpool Street Planned operated by c2c
Empty coaching stock not available to passengers
No movement reports · booked away 2031 · either it has not started, or its reports are not reaching us
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| Chadwell Heath Turnback not advertised | 2031 | |||||
| CTH Chadwell Heath pass 1 min pathing allowance ELLine | 3 | 20322032 | EL | |||
| IFD Ilford pass 1 min pathing allowance ELLineELPath | 3 | 20382038 | EL | EL | ||
| Forest Gate Junction pass 1 min engineering, 2½ min pathing allowance MLLineELPath | 2041½2041½ | ML | EL | |||
| SRA Stratford pass 1 min engineering allowance MLLineMLPath | 9 | 2046½2046½ | ML | ML | ||
| XOW Bow Junction pass MLLineMLPath | 20492049 | ML | ML | |||
| BET Bethnal Green pass MLLineMLPath | 20512051 | ML | ML | |||
| LST London Liverpool Street not advertised | 8 | 2054 | ||||
Italic estimated timing, bold is actual.