25th September 2026 Follow Detailed View
10:30 – Bristol Temple Meads → London Paddington Arrived +5 Late operated by Great Western Railway
diesel for 26 min · electric from Chippenham for 1h13
Reported as far as London Paddington · 7 of 7 stops made · 118 of 118 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| BRI Bristol Temple Meads | 13 | 1030 | 1030 | ·on time | ||
| BTH Bath Spa | 2 | 1041 | 1043 | 1041 | 1043 | ·on time |
| CPM Chippenham Pathed as Class 802 on electric at 125mph from here | 2 | 1054 | 1056 | 1054 | 1056 | ·on time |
| SWI Swindon | 3 | 1109 | 1111 | 1114 | 1115 | +4 |
| DID Didcot Parkway | 2 | 1126 | 1128 | 1132 | 1133 | +5 |
| RDG Reading | 10 | 1140 | 1145 | 1145 | 1147 | +2 |
| PAD London Paddington | 4 was 5 | 1209 | 1214 | +5 |
Italic estimated timing, bold is actual.