This is the 1B25 1718 London Paddington to Swansea on 18th September 2026. See today's trains from London Paddington around 1718 →
18th September 2026 Detailed View
17:18 – London Paddington → Swansea Arrived -5 Early operated by Great Western Railway
electric for 1h55 · diesel from Cardiff Central for 59 min
Reported as far as Swansea · 11 of 11 stops made · 190 of 190 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| PAD London Paddington | 8 | 1718 | 1718 | ·on time | ||
| RDG Reading | 9 | 1741 | 1743 | 1741 | 1742 | -1 |
| DID Didcot Parkway | 1 | 1755 | 1756 | 1753 | 1755 | -1 |
| SWI Swindon | 4 | 1812 | 1813 | 1814 | 1816 | +3 |
| BPW Bristol Parkway | 2 | 1835 | 1837 | 1840 | 1841 | +4 |
| NWP Newport (South Wales) | 2 | 1857 | 1858 | 1900 | 1902 | +4 |
| CDF Cardiff Central Pathed as Class 802 on diesel at 125mph from here | 3 | 1910 | 1913 | 1914 | 1915 | +2 |
| BGN Bridgend | 1 | 1932 | 1937 | 1934 | 1936 | -1 |
| PTA Port Talbot Parkway | 1 | 1948 | 1950 | 1947 | 1949 | -1 |
| NTH Neath | 1 | 1956 | 1958 | 1955 | 1956 | -2 |
| SWA Swansea | 3 | 2012 | 2007 | -5 |
Italic estimated timing, bold is actual.