This is the 1L18 1122 Swansea to London Paddington on 25th August 2026. See today's trains from Swansea around 1122 →
25th August 2026 Detailed View
11:22 – Swansea → London Paddington Arrived On time operated by Great Western Railway
diesel for 56 min · electric from Cardiff Central for 1h54
Reported as far as London Paddington · 10 of 10 stops made · 189 of 189 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| SWA Swansea | 3 | 1122 | 1121 | -1 | ||
| NTH Neath | 2 | 1133 | 1134 | 1133 | 1134 | ·on time |
| PTA Port Talbot Parkway | 2 | 1140 | 1143 | 1141 | 1142 | -1 |
| BGN Bridgend | 2 | 1155 | 1156 | 1154 | 1156 | -1 |
| CDF Cardiff Central Pathed as Class 802 on electric at 125mph from here | 2 | 1217 | 1218 | 1215 | 1218 | -1 |
| NWP Newport (South Wales) | 3 | 1231 | 1235 | 1229 | 1234 | -1 |
| BPW Bristol Parkway | 3 | 1254 | 1255 | 1254 | 1256 | +1 |
| SWI Swindon | 1 | 1318 | 1320 | 1317 | 1319 | -1 |
| RDG Reading | 11 was 10 | 1346 | 1349 | 1344 | 1348 | -1 |
| PAD London Paddington | 8 | 1412 | 1412 | ·on time |
Italic estimated timing, bold is actual.