This is the 1L90 2002 Cheltenham Spa to London Paddington on 17th September 2026. See today's trains from Cheltenham Spa around 2002 →
17th September 2026 Detailed View
20:02 – Cheltenham Spa → London Paddington Arrived On time operated by Great Western Railway
diesel for 1h03 · electric from Swindon for 1h02
Reported as far as London Paddington · 9 of 9 stops made · 120 of 120 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Cheltenham Spa → Gloucester
1 of 2
Gloucester → London Paddington
2 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CNM Cheltenham Spa | 1 | 2002 | 2003 | +1 | ||
| GCR Gloucester | 1 | 2014 | 2019 | 2012 | 2019 | ·on time |
| SHU Stonehouse | 1 | 2030 | 2030 | 2031 | 2033 | +2 |
| STD Stroud | 1 | 2034 | 2035 | 2039 | +4 | |
| KEM Kemble | 1 | 2049 | 2050 | 2052 | 2053 | +3 |
| SWI Swindon Pathed as Class 802 on electric at 125mph from here | 1 | 2103 | 2105 | 2105 | 2107 | +2 |
| DID Didcot Parkway | 2 | 2121 | 2122 | 2124 | 2125 | +3 |
| RDG Reading | 10 | 2135 | 2143 | 2137 | 2142 | -1 |
| PAD London Paddington | 8 | 2207 | 2207 | ·on time |
Italic estimated timing, bold is actual.