This is the 1L90 2002 Cheltenham Spa to London Paddington on 22nd September 2026. See today's trains from Cheltenham Spa around 2002 →
22nd September 2026 Detailed View
20:02 – Cheltenham Spa → London Paddington Partially cancelled — Uninvestigated Cancellations System Roll-Ups only operated by Great Western Railway
This service was cancelled between Swindon and London Paddington.
diesel for 1h03 · electric from Swindon for 1h02
Reported as far as Swindon · 5 of 9 stops made, 4 cancelled · 43 of 120 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| CNM Cheltenham Spa | 1 | 2002 | Cancelled | |||
| GCR Gloucester | 1 | 2014 | 2019 | 2024 | +5 | |
| SHU Stonehouse | 1 | 2030 | 2030 | 2034 | 2036 | +6 |
| STD Stroud | 1 | 2034 | 2035 | 2039 | 2041 | +6 |
| KEM Kemble | 1 | 2049 | 2050 | 2100 | 2125 | +35 |
| SWI Swindon Pathed as Class 802 on electric at 125mph from here | 3 was 1 | 2103 | 2105 | 2138 | +36 | |
| DID Didcot Parkway | 2 | 2121 | 2122 | Cancelled | ||
| RDG Reading | 10 | 2135 | 2143 | Cancelled | ||
| PAD London Paddington | 8 | 2207 | Cancelled |
Italic estimated timing, bold is actual.