This is the 2U16 1150 Exeter St Davids to Cardiff Central on 18th September 2026. See today's trains from Exeter St Davids around 1150 →
18th September 2026 Detailed View
11:50 – Exeter St Davids → Cardiff Central Arrived +7 Late operated by Great Western Railway
This service has been delayed by a fault on a train in front of this one.
diesel for 1h51 · electric from Patchway for 35 min
Reported as far as Cardiff Central · 14 of 14 stops made · 113 of 113 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| EXD Exeter St Davids | 6 | 1150 | 1154 | +4 | ||
| TAU Taunton | 5 | 1212 | 1219 | 1227 | 1229 | +10 |
| BWT Bridgwater | 2 | 1228 | 1229 | 1239 | 1240 | +11 |
| HIG Highbridge & Burnham | 2 | 1236 | 1236 | 1247 | 1248 | +12 |
| WSM Weston-super-Mare | 2 was 1 | 1246 | 1248 | 1258 | 1301 | +13 |
| WOR Worle | 1253 | 1254 | 1305 | 1309 | +15 | |
| YAT Yatton | 2 | 1259 | 1300 | 1315 | 1316 | +16 |
| NLS Nailsea & Backwell | 2 | 1305 | 1306 | 1321 | 1322 | +16 |
| BRI Bristol Temple Meads Pathed as Class 802 on diesel at 125mph from here | 3 | 1315 | 1325 | 1332 | 1336 | +11 |
| FIT Filton Abbey Wood | 4 | 1331 | 1337 | 1344 | 1345 | +8 |
| PWY Patchway Pathed as Class 802 on electric at 125mph from here | 2 | 1340 | 1341 | 1348 | 1349 | +8 |
| STJ Severn Tunnel Junction | 3 | 1352 | 1353 | 1358 | 1359 | +6 |
| NWP Newport (South Wales) | 2 | 1402 | 1403 | 1409 | 1410 | +7 |
| CDF Cardiff Central | 4 | 1416 | 1423 | +7 |
Italic estimated timing, bold is actual.