This is the 2U24 1550 Exeter St Davids to Cardiff Central on 7th September 2026. See today's trains from Exeter St Davids around 1550 →
7th September 2026 Detailed View
15:50 – Exeter St Davids → Cardiff Central Arrived +4 Late operated by Great Western Railway
This service has been delayed by congestion.
diesel for 1h46 · electric from Patchway for 36 min
Reported as far as Cardiff Central · 17 of 17 stops made · 113 of 113 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| EXD Exeter St Davids | 6 was 5 | 1550 | 1552 | +2 | ||
| TAU Taunton | 4 was 5 | 1612 | 1618 | 1615 | 1617 | -1 |
| BWT Bridgwater | 2 | 1627 | 1628 | 1627 | 1628 | ·on time |
| HIG Highbridge & Burnham | 2 | 1634 | 1635 | 1634 | 1636 | +1 |
| WSM Weston-super-Mare | 1 | 1645 | 1646 | 1645 | 1646 | ·on time |
| WNM Weston Milton | 1649 | 1649 | 1649 | 1650 | +1 | |
| WOR Worle | 2 | 1653 | 1654 | 1653 | 1655 | +1 |
| YAT Yatton | 2 | 1659 | 1700 | 1700 | 1700 | ·on time |
| NLS Nailsea & Backwell | 2 | 1705 | 1706 | 1706 | 1706 | ·on time |
| PSN Parson Street | 2 | 1713 | 1713 | 1713 | 1714 | +1 |
| BMT Bedminster | 3 | 1716 | 1716 | 1716 | 1717 | +1 |
| BRI Bristol Temple Meads Pathed as Class 802 on diesel at 125mph from here | 5 | 1720 | 1724 | 1720 | 1724 | ·on time |
| FIT Filton Abbey Wood | 4 | 1730 | 1732 | 1730 | 1733 | +1 |
| PWY Patchway Pathed as Class 802 on electric at 125mph from here | 2 | 1735 | 1736 | 1741 | 1743 | +7 |
| STJ Severn Tunnel Junction | 3 | 1745 | 1746 | 1752 | 1753 | +7 |
| NWP Newport (South Wales) | 2 | 1756 | 1757 | 1802 | 1804 | +7 |
| CDF Cardiff Central | 3 | 1812 | 1816 | +4 |
Italic estimated timing, bold is actual.