5G29 2221 Worcester Shrub Hill to Stoke Gifford

TrainTimesLive
Menu Close menu

25th September 2026

22:21 – Worcester Shrub Hill → Stoke Gifford Arrived -25 Early operated by Great Western Railway

Reported off its booked route at Cheltenham Spa. The calling pattern below is the route it was booked over.

Empty coaching stock not available to passengers

Reported as far as Stoke Gifford · 1 of 1 stop made · 61 of 61 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
WOS Worcester Shrub Hill not advertised 1 2221 no report
Worcester Wylds Lane Junction pass UM 2222½2222½ passno report
Norton Junction pass 22262226 passno report
XAY Abbotswood Junction pass ½ min pathing allowance 2227½2227½ passno report
ASC Ashchurch for Tewkesbury pass 1 min engineering, ½ min pathing allowance 2 2237½2237½ passno report
CNM Cheltenham Spa not advertised operational stop, crew changed off routeTRUST reported this movement away from the booked route 1 min pathing allowance 1 2244½2246 22302230 -32
Barnwood Junction pass 2253½2253½ pass2237 -16
Gloucester Sig. G356 not advertised operational stop, waits for another train to pass 2255½2303 no reportno report
Gloucester Yard Junction pass 23062306 pass2252 -14
Standish Junction pass 3 min pathing allowance 23122312 pass2257 -15
Charfield pass 3½ min pathing allowance 23232323 pass2306 -17
YAE Yate pass 2 2330½2330½ pass2310 -19
Westerleigh Junction pass 2332½2332½ pass2312 -20
BPW Bristol Parkway not advertised operational stop 2 2336½2343 23172318 -25
Stoke Gifford not advertised 2346 2321 -25

Italic estimated timing, bold is actual.