22nd September 2026
16:21 – Exeter St Davids → Plymouth Arrived +10 Late operated by Great Western Railway
Empty coaching stock not available to passengers
Reported as far as Plymouth · 2 of 2 stops made · 52 of 52 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| EXD Exeter St Davids not advertised | 6 | 1621 | 1621 | ·on time | ||
| DWW Dawlish Warren pass | 16301630 | pass1630 | ·on time | |||
| DWL Dawlish pass | 1 | 1631½1631½ | pass1632 | +1 | ||
| TGM Teignmouth pass | 1 | 16341634 | pass1635 | +1 | ||
| NTA Newton Abbot not advertised operational stop, waits for another train to pass | 2 | 1639½1645½ | 16431643 | +4 | ||
| Newton Abbot West Junction pass | 1646½1646½ | pass1646 | ·on time | |||
| Dainton Tunnel pass | 16501650 | pass1650 | ·on time | |||
| TOT Totnes pass | 1655½1655½ | pass1656 | +1 | |||
| Rattery pass | D | 1700½1700½ | pass1706 | +6 | ||
| Aish Emergency Crossover pass | D | 1703½1703½ | pass1709 | +6 | ||
| IVY Ivybridge pass | 1 | 1707½1707½ | pass1712 | +6 | ||
| Hemerdon pass | D | 17121712 | pass1718 | +6 | ||
| Tavistock Junction pass 1 min engineering allowance | D | 17151715 | pass1721 | +6 | ||
| Lipson Junction pass | 1717½1717½ | pass1722 | +5 | |||
| PLY Plymouth not advertised | 4 was 5 | 1720 | 1730 | +10 | ||
Italic estimated timing, bold is actual.