5V84 2306 Westbury to St Philips Mrsh H S T D

TrainTimesLive
Menu Close menu

15th September 2026

23:06 – Westbury → St Philips Mrsh H S T D Arrived -10 Early operated by Great Western Railway

Empty coaching stock not available to passengers

Reported as far as St Philips Mrsh H S T D · 2 of 2 stops made · 30 of 30 miles

Formation Classes 158, 166 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spaces

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
WSB Westbury not advertised 3 2306 2307 +1
Hawkeridge Junction pass 3½ min pathing allowance 2307½2307½ pass2308 +1
Bradford Junction pass 1 min engineering, 4 min pathing allowance 23162316 pass2313 -3
Bathampton Junction pass 2330½2330½ pass2322 -8
BTH Bath Spa pass 1 min engineering, 6½ min pathing allowance 1 23342334 pass2325 -8
North Somerset Junction pass ½ min pathing allowance UMLine 2350½2350½ pass2336 -14 UM
Bristol East Junction pass UFLine 23522352 pass2338 -14 UF
BRI Bristol Temple Meads not advertised Service gains coaches here, reverses here 1 was 5 23540006 23390004 -2
Bristol East Junction pass DMLine 00070007 pass0005 -2 DM
North Somerset Junction pass 0009½0009½ pass0007 -2
XPM St Philips Mrsh H S T D not advertised 0020 0010 -10

Italic estimated timing, bold is actual.