23rd September 2026
23:15 – York → Doncaster Carr IEP Depot Arrived -8 Early operated by TransPennine Express
Empty coaching stock not available to passengers
Reported as far as Doncaster Carr IEP Depot · 1 of 1 stop made · 34 of 34 miles
Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| YRK York not advertised 3 min engineering, 1 min pathing allowance NNLLine | 3 was 5 | 2315 | 2315 | ·on time | NNL | |
| Colton Junction pass 4 min pathing allowance | 2323½2323½ | pass2327 | +4 | |||
| Hambleton North Junction pass 3 min pathing allowance | 2331½2331½ | pass2332 | +1 | |||
| Temple Hirst Junction pass 4 min pathing allowance | 2337½2337½ | pass2335 | -2 | |||
| Shaftholme Junction pass 1 min engineering, 3 min pathing allowance | 23462346 | pass2347 | +1 | |||
| DON Doncaster not advertised operational stop | 1 | 23540001 | 23542355 | -6 | ||
| Sand Bank Junction pass | 00030003 | passno report | ||||
| Doncaster Carr IEP Depot not advertised | 0006 | 2358 | -8 | |||
Italic estimated timing, bold is actual.