13th September 2026
23:40 – Darlington → York Arrived -30 Early operated by TransPennine Express
Empty coaching stock not available to passengers
Reported as far as York · 2 of 2 stops made · 44 of 44 miles
Formation Class 185
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| DAR Darlington not advertised 15 min engineering, 4 min pathing allowance | 4 | 2340 | 2339 | -1 | ||
| NTR Northallerton pass 2 min pathing allowance SLLine | 1 | 00090009 | pass2349 | -19 | SL | |
| THI Thirsk pass 2 min pathing allowance SLLine | 1 | 00170017 | pass2355 | -21 | SL | |
| Tollerton Junction pass 2 min pathing allowance SLLine | 00310031 | pass0007 | -24 | SL | ||
| Skelton Bridge Junction pass 2 min engineering, 1 min pathing allowance SLLine | 0038½0038½ | pass0013 | -25 | SL | ||
| Skelton Junction (York) pass 2 min engineering allowance | 0043½0043½ | pass0014 | -29 | |||
| YRK York not advertised operational stop, reverses here | 5 | 0048 | 0018 | -30 | ||
Italic estimated timing, bold is actual.